The timeline view displays the events on a timeline. There are two types of timeline views.
Basic Timeline View
Displays the events on a timeline. Represented with the calendar icon .
The basic timeline functionalities are:
• Zoom in and out to control the viewed time span
• Select the date to be displayed by clicking on the date section or on the arrows next to it to switch between days
• Switch back to the current time by clicking “Now”
• Apply filters to the events that are displayed:
• By status
• By project
• Hovering over an event will display additional general information
• Clicking on an event will open its detailed view
• Bulk actions to the events can be performed in the timeline view by ticking the checkbox at the bottom right of the event and then clicking the main 3-dot menu
Timeline View by Dedicated Resources
This view displays the dedicated resources with SES, if any, and the different events that use these resources. Represented with the following icon.
• The dedicated resources will be presented in the left section of the screen and they will be sorted by types. The user can perform the following actions:
• Choose the types of resources
• Choose the transmission roles (source, relay point, destination)
• Choose which statuses (of the events) will be displayed
• Filter by project
• If an event has a service which uses the displayed status, the event will be shown in the resource row
• If there is a conflict (e.g., two or more events are using the same resource at the same time) the conflict will be highlighted in red
• You can perform bulk actions to the events in the timeline by ticking the checkbox at the bottom right of the event and clicking the main 3-dot menu